Main   |    News   |    Gallery   |    Contact

Building the iron-reinforced concrete block

Preparation of the rebar cage 1. Preparation of the rebar cage 2. The hole with a depth of 1.3m. Tools. Lower half of the rebar structure (already in the hole) and the power/internet tubes. Ready for pouring the concrete. The first barrow of the concrete. Filling up the hole... Formwork is placed around the assembled rebar cage. Filling up the formwork... In the background, the upper iron plate with the supporing threads can be seen. A nice background image. The structure is completed. Curing...

Click on the image thumbnails to open the gallery as well as to read the image captions and descriptions!